• Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
  • Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
  • Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
  • Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
  • Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
  • Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester

Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester

After-sales Service: 1 Year
Warranty: 1 Year
Temperature: -5°c~40°c
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester pictures & photos
Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
US $1,400-2,400 / Set
Min. Order: 1 Set
Diamond Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Hubei, China
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Experienced Team
The supplier has 6 foreign trading staff(s) and 3 staff(s) with over 6 years of overseas trading experience
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (28)

Basic Info.

Model NO.
HTRS-V
Humidity
<95%(25°c)
Altitude
<2500m
Outside Interference
No Exceptionally Strong Vibration, No Extra - Stro
Power Supply
220VAC±10%, 45Hz~55Hz.
Current Output
0 ~ 10A
Voltage Measurement
0 ~ 10V
Test Capacity
30kVA ~ 2500kVA
Voltage
0~450V (Phase Voltage), 0 ~ 800V (Line Voltage)
Current
0 ~ 100A
Frequency
45Hz ~ 65Hz
Voltage Accuracy
± 0.2% Fs; ± 0.2%
Current Accuracy
± 0.2% Fs
Dimension
400×300×170mm
Weight
6kg (Not Including Test Lines)
Transport Package
Wooden Case or Carton
Specification
see details
Trademark
HV TEST
Origin
China
HS Code
9030849000
Production Capacity
200 Sets Per Month

Packaging & Delivery

Package Size
47.00cm * 41.00cm * 40.00cm
Package Gross Weight
19.000kg

Product Description

Functional characteristics
Measure the transformer load current, load loss, short-circuit voltage, short circuit (load) losses, capability.
      Note: need to equip with three phase regulator yourself if need to do transformer load no-load test
 
Three Methods
Do three-phase transformer no-load, load test, the instrument can automatically determine the wiring is correct, and shows three-phase voltage and current vector map.
   Single machine can do the following 100KVA distribution transformer full load current experiment; in one third of the rated current, complete 250KVA distribution transformer load the following test (in one third of the rated current, the instrument can be converted to load loss under rated current parameters, the machine is mainly used in the test bed with integrated supporting the use of transformers.
All the related test results are automatically corrected. Instrument can automatically such as: the waveform correction, temperature correction, non-rated voltage correction, calibration, and other non-rated current correction, so that more accurate test results.
320x240 large screen, high brightness LCD display, full Chinese menu and operations to achieve prompt and friendly man-machine dialogue, touch buttons make the operation more convenient, wide LCD with brightness adjustment, can be adapted to the various summer and winter season.
     Comes with real-time clock, automatically recording test date, time, the preservation of favorable results, management.
Panel-type thermal printer, the scene quickly print test results.
Data (test sample set, the measurement results, the test of time, etc.) with power-down storage and browsing features, you can store 500 set of experimental results with computer on-line data transfer.
Allows an external voltage transformer and current transformer for extended range of measurement, any measurable parameter is the test product.
  1. The main technical indicators
1.Test Item
  • RMS phase voltage:Uab,Ubc,Uca;
   
  • Average value of three-phase AC voltage:/Uab,/Ubc,/Uca;
  
  • Three-phase current RMS:Ia,Ib,Ic;
   
  • Percentage of no-load loss and no-load current:Po,Io%;
   
  • Load loss, impedance voltage, and the percentage of short-circuit impedance:Pt,ekt,Zt;
   
   Any given temperature, load loss, the percentage impedance voltage and short circuit impedance;

   Any given temperature, load loss, the percentage impedance voltage and short circuit impedance;
2. Main technical parameters

Capacity measuring range : 30kVA ~ 31500kVA 

Current measuring range: 0 -100A  auto-switch the measurement range

Current measurement accuracy: ± (0.2% + 3digits)

Voltage measurement range: Line Voltage0-750V;phase voltage 0-450V, auto-switch the measurement range

Voltage measurement accuracy: ± (0.2% + 3digits)

Insulation resistance: > 100MΩ

Leakage current: <3.5mA

Dielectric strength: the power connection on the chassis can withstand: 1500V

    External transformer can broaden the scope of measurement instruments;

    Frequency Range: 40 ~ 65Hz, accuracy class 0.2;

    Power Input: AC220V ± 10%;



 
Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load TesterHtrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load TesterHtrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load TesterHtrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load TesterHtrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load TesterHtrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester





FAQ
1. Is your company a sales company or a manufacturer?
Wuhan Huatian Electric Power Automation CO., LTD.is an industrial and trade enterprise, with its own  factory, self-produced and self-sold. We were founded in 2004 and have fifteen years of production experience. Our company has reliable production lines, test rooms and R&D centers.

2. Whether the goods are in stock, whether they can be customized, and how long the delivery time is.
After the goods have been ordered, we can be made to order according to the special requirements of customers by using the latest technology. The delivery time is usually within 10 working days if there are no accidents.

3. Is the quality guaranteed?
In order to ensure quality, we use imported components in large quantities. After three times of quality inspection, the goods can be sent out, and the export is uniformly packed in non-fumigation wooden boxes.

4. What are the after-sales terms?
We offer free consulting service, one year warranty, and adopt various methods such as email communication, video calls, technology door-to-door, aiming to solve any after-sales problems in a timely manner.

5. What are the cooperative countries or regions?
Products have been successfully exported to the United States, Brazil, Australia, Russia, the Netherlands, Indonesia, Bangladesh, Iran, India, Saudi Arabia, Mongolia, Japan and other countries and regions. In the United States, India, Vietnam and other regions have cooperative distributors, can provide thoughtful services.




 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester pictures & photos
Htrs-V Electric Transformer Ratio Test Meter Transformer Capacity Load No-Load Tester
US $1,400-2,400 / Set
Min. Order: 1 Set
Diamond Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Year of Establishment
2021-03-15
Management System Certification
ISO9001:2015, ISO14001:2015
Export Year
2011-07-01